Present Installed Generation Capacity (MW) as on 31st January 2026 Public Sector | No of Power Plant | Installed Generation Capacity (MW) | | BPDB | 40 | 6,461 | | APSCL | 5 | 1,394 | | EGCB | 4 | 1032 | | NWPGCL | 7 | 1,401 | | B-R Power gen | 3 | 472 | | RPCL | 4 | 392 | CPGCBL | 1 | 1150 | | Subtotal | 64 | 12,302 (43%) | Joint Venture | | | | BCPCL (JV of NWPGCL & CMC, China) | 1 | 1,244 | | BCPCL (JV of BPDB & NTPC, India) | 1 | 1,234 | | RNPL (JV of RPCL & Norinco) | 1 | 590 | | Subtotal | 3 | 3,068 (11%) | Private Sector | | | | IPPs | 64 | 10,582 | | SIPPs (BPDB) | 0 | 0 | | SIPPs (REB) | 3 | 130 | | 15 YR. Rental | ০ | ০ | | 3/5 YR. Rental | 0 | 00 | | Rental(No Electricity No Payment) | 2 | 141 | | Subtotal | 69 | 10,853 (37%) | Power Import | | | | Bheramara HVDC | | 1,000 | | Tripura | | 160 | | Jarkhondo (India), Adani Power | | 1,496 | | Import (Nepal) | | 40 | | Subtotal | | 2,696 (9%) | | TOTAL | 136 | 28,919* |
*Including Captive Power, off grid Renewable Energy & Off grid HFO Total Installed Capacity (28,919+2,800+608+5) =32,332 MW | MAXIMUM DEMAND SERVED | 16,794MW | 23-07-2025 | | TRANSMISSION LINES (400 kV) | 3,087Ckt. K.M | FY-2025 | | TRANSMISSION LINES (230 kV) | 4,738Ckt. K.M | FY-2025 | | TRANSMISSION LINES (132 kV) | 9,263Ckt. K.M | FY-2025 | | GRID SUB-STATION CAPACITY (400/230 kV) | 12,180 MVA | FY-2025 | | GRID SUB-STATION CAPACITY (400/132 kV) | 3,940 MVA | FY-2025 | | GRID SUB-STATION CAPACITY (230/132 kV) | 20,125 MVA | FY-2025 | | GRID SUB-STATION CAPACITY (230/33 kV) | 6,20 MVA | FY-2025 | GRID SUB-STATION CAPACITY (132/33 kV) | 36,935 MVA | FY-2025 | | DISTRIBUTION LINES (33 KV & BELOW) (only BPDB) | 53,278 K.M | FY-2025 | | CONSUMER NUMBER (BPDB) | 44,49,814 | FY-2025 |
 PRIMARY GRID SYSTEM OF BANGLADESH (As on June, 2024) (Click here for download Grid Map as pdf format.) 
|