Present Installed Generation Capacity (MW) as on 31st August 2026

Public Sector

No of Power PlantInstalled Generation Capacity (MW)
BPDB406,461
APSCL51,394
EGCB41032
NWPGCL71,401
B-R Power gen3472
RPCL4392

CPGCBL

1

1150
Subtotal6412,302 (41%)

Joint Venture

BCPCL (JV of NWPGCL & CMC, China)11,244
BCPCL (JV of BPDB & NTPC, India)11,234
RNPL (JV of RPCL & Norinco)11,244
Subtotal33,722(13%)

Private Sector

IPPs6410,152
SIPPs (BPDB)00
SIPPs (REB)3130
15 YR. Rental ০০
3/5 YR. Rental000
Rental(No Electricity No Payment)2141
Subtotal6910,423 (36%)

Power Import

Bheramara HVDC 1,000
Tripura 160
Jarkhondo (India), Adani Power 1,496
Import (Nepal) 40
Subtotal 2,696 (9%)
TOTAL13629,143*

*Including Captive Power, off grid Renewable Energy & Off grid HFO Total Installed Capacity (29,143+2,800+738+7) =32,688 MW

MAXIMUM DEMAND SERVED

17,201MW

20-05-2026
TRANSMISSION LINES (400 kV)3,282Ckt. K.MFY-2026
TRANSMISSION LINES (230 kV)

5,437Ckt. K.M

FY-2026
TRANSMISSION LINES (132 kV)

9,883Ckt. K.M

FY-2026
GRID SUB-STATION CAPACITY (400/230 kV)16,180 MVA FY-2026
GRID SUB-STATION CAPACITY (400/132 kV)4,590 MVAFY-2026
GRID SUB-STATION CAPACITY (230/132 kV)

24,975 MVA

FY-2026
GRID SUB-STATION CAPACITY (230/33 kV)

760 MVA

FY-2026

GRID SUB-STATION CAPACITY (132/33 kV)

40,070 MVAFY-2026
DISTRIBUTION LINES (33 KV & BELOW) (only BPDB)

53,950 K.M

FY-2026
CONSUMER NUMBER (BPDB)

46,04,926

FY-2026

PRIMARY GRID SYSTEM OF BANGLADESH