Present Installed Generation Capacity (MW) as on 31st August 2026 Public Sector | No of Power Plant | Installed Generation Capacity (MW) | | BPDB | 40 | 6,461 | | APSCL | 5 | 1,394 | | EGCB | 4 | 1032 | | NWPGCL | 7 | 1,401 | | B-R Power gen | 3 | 472 | | RPCL | 4 | 392 | CPGCBL | 1 | 1150 | | Subtotal | 64 | 12,302 (41%) | Joint Venture | | | | BCPCL (JV of NWPGCL & CMC, China) | 1 | 1,244 | | BCPCL (JV of BPDB & NTPC, India) | 1 | 1,234 | | RNPL (JV of RPCL & Norinco) | 1 | 1,244 | | Subtotal | 3 | 3,722(13%) | Private Sector | | | | IPPs | 64 | 10,152 | | SIPPs (BPDB) | 0 | 0 | | SIPPs (REB) | 3 | 130 | | 15 YR. Rental | ০ | ০ | | 3/5 YR. Rental | 0 | 00 | | Rental(No Electricity No Payment) | 2 | 141 | | Subtotal | 69 | 10,423 (36%) | Power Import | | | | Bheramara HVDC | | 1,000 | | Tripura | | 160 | | Jarkhondo (India), Adani Power | | 1,496 | | Import (Nepal) | | 40 | | Subtotal | | 2,696 (9%) | | TOTAL | 136 | 29,143* |
*Including Captive Power, off grid Renewable Energy & Off grid HFO Total Installed Capacity (29,143+2,800+738+7) =32,688 MW | MAXIMUM DEMAND SERVED | 17,201MW | 20-05-2026 | | TRANSMISSION LINES (400 kV) | 3,282Ckt. K.M | FY-2026 | | TRANSMISSION LINES (230 kV) | 5,437Ckt. K.M | FY-2026 | | TRANSMISSION LINES (132 kV) | 9,883Ckt. K.M | FY-2026 | | GRID SUB-STATION CAPACITY (400/230 kV) | 16,180 MVA | FY-2026 | | GRID SUB-STATION CAPACITY (400/132 kV) | 4,590 MVA | FY-2026 | | GRID SUB-STATION CAPACITY (230/132 kV) | 24,975 MVA | FY-2026 | | GRID SUB-STATION CAPACITY (230/33 kV) | 760 MVA | FY-2026 | GRID SUB-STATION CAPACITY (132/33 kV) | 40,070 MVA | FY-2026 | | DISTRIBUTION LINES (33 KV & BELOW) (only BPDB) | 53,950 K.M | FY-2026 | | CONSUMER NUMBER (BPDB) | 46,04,926 | FY-2026 |
 PRIMARY GRID SYSTEM OF BANGLADESH (As on June, 2024) (Click here for download Grid Map as pdf format.) 
|